Permanent Link Certification
Fluke DTX/Versiv autotest against TIA category spec — NEXT, return loss, delay skew and length recorded per port.
Every copper drop, every project
Full-lifecycle physical layer — pathway design, remediation, installation and certification. Clean pathways, correct bend radius, labeled both ends, and a test report for every port. We rebuild neglected racks and we build new plant from empty conduit.
Cat6 / Cat6A
OM4 / OS2
Fluke Versiv · OTDR
15 years
Design, remediation, installation and certification — one crew accountable for the plant end to end, with the paperwork to prove it.
Pathways, counts and closets engineered before the first spool comes off the truck.
Neglected racks and undocumented plant brought back to a standard you can hand to an auditor.
Plenum copper and fiber pulled to spec — correct bend radius, supported, labeled both ends.
Nothing is handed over untested. Every permanent link carries a signed result.
Four levels of proof, each producing an archived deliverable — not a tone test and a handshake.
Fluke DTX/Versiv autotest against TIA category spec — NEXT, return loss, delay skew and length recorded per port.
Every copper drop, every project
Light source and power meter insertion-loss testing against the calculated loss budget for each strand and direction.
Horizontal and short backbone runs
Full trace capture locating every splice, connector and event along the span, archived with the as-builts.
Campus and inter-building backbone
Labeled rack elevations, port maps, pathway drawings and the complete test archive delivered as a living document set.
Handover and audit readiness
The full physical-layer toolkit — from pathway layout to the signed certification archive.
Plenum-rated runs pulled to spec with documented pathway, support spacing and separation from EMI sources.
OS2 backbone and OM4 horizontal runs, fusion spliced and terminated with loss budgets recorded per strand.
Legacy rack remediation: re-dress, vertical and horizontal management, airflow correction, abandoned-cable removal.
Re-termination onto new panels with a color-coded patching standard and a port map you can actually maintain.
Tray, conduit, J-hook and sleeve installation with rated firestop at every penetration.
Every permanent link tested and certified. Results delivered as signed PDF plus raw export for your records.
Splice-case management and OTDR trace archives for campus backbone and outside-plant spans.
Labeled elevations, port maps, pathway drawings and test records — everything the next tech needs.
The spec we hold every install to, regardless of project size.
Cat6 / 6A
OM4 / OS2
100%
15 years
Seven verticals, each with its own access windows, compliance rules and build constraints.
Infection-control scheduling, plenum compliance and biomedical device drops.
Guest room and back-of-house cabling phased around occupancy.
POS, camera and AP drops rolled out on a repeatable per-store template.
Terminal, yard and gate cabling with outside-plant fiber spans.
High-bay drops, aisle pathways and ruggedized runs in metal-dense plants.
Campus backbone and classroom drops delivered in summer windows.
Documented, compliance-driven installs with full test archives.
Three engagement levels, scoped by facility size, uptime requirement and certification depth.
For plants that work but look and behave like a decade of undocumented changes.
New space, expansion, or full replacement — from pathway design to certified handover.
Multi-building campuses where the backbone is the product and downtime is not an option.
Finish the rack with our own gear — modular 1U frames, blanking and brush panels, and PoE utility units engineered for the same installs our crews run.
Run the guided inquiry — facility type, square footage and requirements map straight to a matched tier and scope summary.